WELCOME BACK
GUEST
     
Search in
Select Department
Select Categories
Order Authority
Order Date
Upload Date
 Home     Library
36 results · 105.3K  views · Jan 17, 21

PD (Permanent Disconnection) process for fictitious arrear and ir · UPPCL

New Connection & Services

 145/CE(com)/CUR-II/R-3 ·   01-Feb-18 · MD UPPCL ·   Permanent Disconnection (PD) means disconnecting the electricity supply with termination of the agreement and getting no dues certificate (NOC) from the department. Permanent Disconnection could be c

Videography of Raids/Checking abhiyan to be done · UPPCL

Electricity Theft & Assessment

 369/PSCH/PCL/18 ·   06-Oct-18 · Chairman UPPCL ·   Instruction has been given to do videography during raids or checking to have transparency. It is also required to upload them on RMS Portal. Though, it is also mentioned that only 10 MB space is available to

Aasan kist Yojna (OTS with installment facility) · UPPCL

Metering & Billing

 105/CE(com)/CU-2/OTS/2019-20 ·   10-Nov-19 · MD UPPCL ·   This time Hon. Energy Minister has announced Aasan kisht yojna for the defaulter consumers. This is basically OTS (one-time settlement) scheme/ Surcharge waiver scheme with the installment facility on electricity

No FIR in 135 if commercial activity on domestic connection up to · UPPCL

Electricity Theft & Assessment

 DIG-E/Instruction/2015 ·   30-Jun-15 · DIG Enforcement ·   If commercial activity is being carried out in the part of the domestic connection up to 5 KW, no FIR should be lodged against the consumer. Only checking reports will be filled and assessment will be realized in section

Assessment to be imposed in Section 138 of Electricity Act-2003 · UPPCL

Electricity Theft & Assessment

 490/CE(com-II)/Raid ·   07-Aug-19 · MD UPPCL ·   FIR is being lodged in section-135 of electricity act-2003 if someone found involved in electricity theft. They need to pay revenue assessment also. But, in the case of section-138, only FIR was lodged and no assessment

Assessed Units for Normative billing · UPPCL

Line Charges & Estimate

 12/CE(com)/CU-1 ·   23-Jan-15 · Dir Commercial ·   There are many situations when the meter reader is not able to generate the electricity bill with actual consumption. Particularly, when the meter found defective, door locked, Not Assessble or Not read. It leads the ADF

Migration of decentralized govt connection to the billing softwar · UPPCL

Metering & Billing

 626/CE(com)/CUR-2/R-15 ·   01-Jun-18 · CE Commercial ·   Instructions to convert all the government connection in the Metered connection and update their details on our billing software with reference to the discussion in VC

Migration of decentralized govt connection to the billing softwar · UPPCL

Metering & Billing

 626/CE(com)/CUR-2/R-15 ·   01-Jun-18 · CE Commercial ·   Instructions to convert all the government connection in the Metered connection and update their details on our billing software with reference to the discussion in VC

MOM of Hon. CM meeting about powerloom bunker subsidy · UPPCL

Metering & Billing

 161/CE(com)/CU-2/Bunker ·   15-Feb-18 · CE Commercial ·   Minutes of the meeting regarding power loom subsidy and dues over other govt departments headed by Hon CM Uttar Pradesh.

Surcharge samadhan yojna/OTS - 2018-19 · UPPCL

Metering & Billing

 1732/CE(com)/CU-2/OTS/2018-19 ·   31-Dec-18 · MD UPPCL ·   Surcharge samadhan yojna is earlier known as OTS (One-time Settlement) yojna. Conditions are as follows: Applicable for Rural and Urban consumers. For LMV1 and LMV2 consumers up to 2KW sanctioned load.[

clarification on Electricity duty (ED) exemption of the new and p · UPPCL

Metering & Billing

 279/CE/CU-2/ED ·   08-Mar-18 · MD UPPCL ·   In an investor-friendly move and a major relief for the industry, particularly power-intensive units, the Uttar Pradesh government has exempted all the new and pioneer industrial units from electricity duty (ED). This or