WELCOME BACK
GUEST
 Home     Library     UPPCL
 1454-work/14-PCL/2018-138-K/2011 ·   02-Jul-18 ·   Chairman UPPCL ·   1.14 MB
JPG availabale
  Download (209)

With reference to clause 4.6 e(i), the 4th amendment of Electricity Supply Code-2005

LT loads up to 50 KW shall be developed by the licensee only, for which no supervision charges shall be applicable.

Supervision charges should not be charged for the PTW  (LMV5) connection of up to 50 KW.

Tag: #NoSupervisionForFarmer #NewConnection
Leave a Comment
You are not logged in | Login
 0 comments