Cost Data Book - 2019

Avatar

nishant · 11-Aug-19

Administrator ·  219

The approved rate for the recovery of expenses and charges from prospective consumers for taking electric supply is called Cost Data Book. this cost is effective from 08-July-2019 and applicable for all the distribution licensees of Uttar Pradesh. It is very clearly mentioned that in case of any inconsistency between the Cost Data Book and Electricity Supply Code, the cost data book shall prevail.
Charges for Electric Connection 

  1. Processing Fee
  2. Security Deposit
  3. Line Charges
  4. Meter cost and its equipment cost
  5. 18% GST (Except Security Deposit)
What is new in this cost data book-2019?
  • UPERC exempts system loading charges this time.
  • Security deposit is now average bill of 45 days. Earlier, it was 60 days
  • Single phase PTW connection up to 7 HP is allowed now.
Download the Cost Data Book -2019 DownloadNow.png

NEW CONNECTION CHARGES ANALYSIS AS PER COST DATA BOOK-2019

1. Processing Fee

S.N.

Description

Rate

1

Load upto 1 KW & BPL

Rs. 10/-

2

Load upto 1 KW (Except BPL)

Rs. 50/-

3

Load above 1 KW up to 24.9 KW

Rs. 100/-

4

Load above 24.9 KW up to 50 KW/56 KVA

Rs. 1000/-

5

Load above 56 KVA up to 500 KVA

Rs. 5000/-

6

Load above 500 KVA up to 3000 KVA

Rs. 10000/-

7

Load above 3000 KVA up to 10000 KVA

Rs. 15000/-

8

Load above 10000 KVA

Rs. 25000/-

2. Security Deposit :

Security deposit should be charged as per the following rate. But, later security should be average bill of 45 days.
40% higher security should be charged from the temporary connection of the respective category.

S.N.

Tariff

Description

Rate

Per Unit

1.

LMV1

Upto 1 KW (BPL)

Rs. 0/-

KW

2.

LMV1

Rural Consumer upto 2 KW

Rs. 100/-

KW

3.

LMV1

Urban Consumer upto 2 KW

Rs. 300/-

KW

4.

LMV1

Load above 2 KW

Rs. 400/-

KW

5.

LMV2

Non Domestic Consumers

Rs. 1000/-

KW

6.

LMV2

Sign Board, Sign Post, Flex, Glow Advertising

Rs. 6000/-

KW

7.

LMV3

Gram Panchayat

Rs. 3400/-

KW

8.

LMV3

Nagar Palika & Nagar Panchayat

Rs. 4000/-

KW

9.

LMV3

Nagar Nigam

Rs. 5000/-

KW

10.

LMV4

Govt/Private Institutute

Rs. 4000/-

KW

11.

LMV5

Private Tubewell (PTW)

Rs. 300/-

BHP

12.

LMV6

Small Industries and Power

Rs. 1350/-

KW

13.

LMV7

Public Water Works

Rs. 4000/-

KVA

14.

LMV8

State Tubewell STW

Rs. 2000/-

KW

15.

HV1

HT Consumers

Rs. 4500/-

KVA

16.

HV2

HT Industrial Consumers

Rs. 2200/-

KVA

17.

HV3

Railway Traction

Rs. 4500/-

KVA

18.

HV3

Metro Rail

Rs. 3000/-

KVA

19.

HV4

Lift Irrigation Work

Rs. 3500/-

KVA

20.

-

Electrical Vehicle Charging HT/LT

Rs. 400/-

KW

3. Service Line Charges :

It includes the cost of line construction. Following are the only supervision and labour charges. It does not contain the cost of Cable. This is applicable for cable connection (less than 40 meters) only. A separate estimate is required for other than a cable connection. The consumer needs to purchase the cable with specifications:

  • Load up to 2 KW - 2x4 sq mm PVC armored  cable with the catenary arrangement (Rs. 38/m)
  • Load up to 5 KW - 2x6 sq mm PVC armored  cable with the catenary arrangement (Rs. 45/m)
  • Load up to 5 KW  underground - 2C x 10 sq mm PVC armored cable. (Rs. 56/m)
  • Load from 5 KW to 25 KW - 4x25 sq mm armored  cable with the catenary arrangement (Rs. 213/m)
  • Load from 5 KW to 25 KW  underground - 3.5 C x 35 sq mm XLPE armored cable  (Rs. 220/m)
  • Load from 26 KW to 50 KW - 3.5x70 sq mm armored  cable with catenary arrangement (Rs. 248/m)
  • Load from 26 KW to 50 KW underground- 70 sq mm XLPE cable (Rs. 248/m)

S.N.

Load

Description

Rate

1.

Upto 2 KW

Rural (LMV1 & LMV2 Only)

Rs 150/-

2.

Upto 5 KW

Overhead Urban

Rs 398/-

3.

Upto 5 KW

Underground

Rs 687/-

4.

Upto 5 KW

Underground road crossing

Rs 2187/-

5.

5 KW to 24 KW

Overhead

Rs 2036/-

6.

5 KW to 24 KW

Underground

Rs 3082/-

7.

5 KW to 24 KW

Underground road crossing

Rs 5282/-

8.

25 KW to 50 KW

Overhead

Rs 3132/-

9.

25 KW to 50 KW

Underground

Rs 3477/-

10.

25 KW to 50 KW

Underground road crossing

Rs 6477/-

11.

PTW (Upto 7 BHP)

Overhead (Single Ph Meter)

Rs 468/-

12.

PTW (Upto 7 BHP)

Overhead (Three Ph Meter)

Rs 993/-

13.

PTW (above 7 BHP)

Overhead

Rs 2036/-

4. Meter & Its Equipment

Meter & its equipments charge may be taken with service line charges. Consumer may purchase the meter if it is not available at store. But, it needs to check in departmental lab and specifications should be as specified by the department.

S.N.

Meter Type

Rate

1.

Single Phase Static Meter

Rs. 872/-

2.

Three Phase Static Meter

Rs. 2921/-

3.

3 Ph 4 Wire LT TVM with Cubical

Rs. 8483/-

4.

3 Ph 4 Wire Static TVM 11 KV

Rs. 3768/-

5.

Meter With 11 KV Cubical (Rs. 44709/-)

Rs. 48477/-

6.

Meter With 33 KV Cubical (Rs. 123176/-)

Rs. 126944/-

This rate is applicable for expenses of Electricity Connection to the prospective consumers only. Expenses of System Improvement or other electrification is decided by Stock Issue Rate/Cost Schedule