Electricity Acts, Supply Codes & Regulations · None / 10-Aug-2018 · UPERC
UP Electricity Supply Code, 2005 - 13th Amendment (2018)
Views: 47
Size: 5.79 MB
The Electricity Supply Code (13thAmendment), 2018, introduced significant changes to the U.P. Electricity Supply Code, 2005. A key provision mandates that all new multi-storied buildings must have multi-point connections. Additionally, existing single-point connections in such buildings are required to be converted to multi-point connections by March 31, 2019. This amendment aims to enhance safety, improve load management, and facilitate better billing practices in multi-storied structure.
/
Loading Documents
Advertisement
Recently asked questions
Trending articles
Related Documents
You might also find these documents useful.