Electicity theft
in case raid done by department at registered consumer under sanctioned load of 2 kw and theft found in checking 3.172 kw by meter bypass then on which load should be compounding amount fix and could also adjust one year EC who's paid by consumer
ALOK PANDEY · 23-Jan-22 · 03:01 PM
Member · 2
sir
kindly upload the order for assesment about household submercible pump(how many hours ) , air conditioner (how many no of days)
nishant · 28-Jan-22 · 12:01 PM
Administrator · 219
There is no such order. But, if you go through the supply code, there is a procedure for the determination of connected load. This is taken into consideration for calculating consumption for assessment.
Kindly go through the Note: 4 and 6 for your queries.
ALOK PANDEY · 22-Feb-22 · 07:02 AM
Member · 2
THANK U VERY MUCH SIR.
SIR
I HAVE ANOTHER QUERY ABOUT MINIMUM CHARGES ON ASSESMENT CALCULATION.
WHAT IS THE RULE ABOUT THAT,
IF I HAVE TO CALCULATE ASSMENT FOR HIGHER TARRIF e.g. commercial building construction from a connection of LMV 1.
ONLY 856 KWH HAVE BEEN USED IN ONE YEAR. METER IS HEALTHY.
KINDY CLEARS THE RULES OF MINIMUM CHARGES.
deepsri_86 · 11-May-22 · 06:05 AM
Member · 1
nishant ji
hello this is Deepesh kumar srivastava, Executive officer(technical), The Institution of Engineers, India posted at Headquarters Cell, Delhi. i am from Allahabad. recently i on behalf of my mother aged 62 apply for new electricity connection under jhatpat schme. after step 3 i received sms that application has been rejected citing reason that Assessment Due pending however we have never received any notice/due bill for the same. kindly educate me about this reason cited therof.
nishant · 12-May-22 · 05:05 PM
Administrator · 219
nishant ji
hello this is Deepesh kumar srivastava, Executive officer(technical), The Institution of Engineers, India posted at Headquarters Cell, Delhi. i am from Allahabad. recently i on behalf of my mother aged 62 apply for new electricity connection under jhatpat schme. after step 3 i received sms that application has been rejected citing reason that Assessment Due pending however we have never received any notice/due bill for the same. kindly educate me about this reason cited therof.
The actual reason might be explained by the local officer. But, the term "Assessment" is generally used for penalty against the electricity theft. It might be the possible reason that local electricity authority has issued any assessment bill. Again, the notice could be enquired at the local office
mayankeddorai · 02-Jun-22 · 06:06 PM
Member · 1
Respected Sir,
i want to know regarding the procedure to assess the meter tampering cases where fir was lodged in section 135.
i have suggested to asses it by simple l*f*h*d formula but our EE sir is not sure about it. pls suggest me because it is so confusing. and different division following different procedures in meter tampering cases
Member · 3
Respected Sir,
i want to know regarding the procedure to assess the meter tampering cases where fir was lodged in section 135.
i have suggested to asses it by simple l*f*h*d formula but our EE sir is not sure about it. pls suggest me because it is so confusing. and different division following different procedures in meter tampering cases
nishant · 04-Jun-22 · 09:06 AM
Administrator · 219
मीटर टेम्परिंग के मामले में, खपत का आकलन करने के लिए L*F*H*D का उपयोग किया जाएगा। कभी-कभी, यदि हम मीटर में किये गए धीमेपन का प्रतिशत ज्ञात कर पाते हैं, तो धीमे प्रतिशत को देखते हुए खपत का आकलन कर सकते हैं। उदाहरण के लिए, एक परीक्षण मीटर स्थापित कर अथवा accu check का उपयोग कर, टेंपरिंग द्वारा किये गए वास्तविक धीमेपन को प्रतिशत में निर्धारित कर चुके हैं तो धीमे प्रतिशत को देखते हुए खपत का आकलन कर सकते हैं।
In case of meter tempering, L*F*H*D shall be used to assess the consumption. Sometimes, if we are able to find the percentage of slowness made in the meter. For example, a test meter was installed or we have used accu check to determine the actual slowness made by tempering, we may assess the consumption considering the slowness percentage.
Member · 3
in case raid done by department at registered consumer under sanctioned load of 2 kw and theft found in checking 3.172 kw by meter bypass then on which load should be compounding amount fix and could also adjust one year EC who's paid by consumer
Yahi mere sath bhi hua hai
Member · 3
Halo
Sudhir singh · 12-Jun-22 · 02:06 AM
Member · 14
Good morning Nishant sir...
In case of LMB 6 load is given an HP but we calculate assessment in kilowatt
But what about compounding we take
on HP or in kilowatt..
Plz clearify sir...thank u..
nishant · 12-Jun-22 · 02:06 PM
Administrator · 219
Compounding will be considered according to KW.
Actually the unit in which the fixed charge is written in the tariff book is to be considered for compounding calculation.
So, HP will be considered for compounding calculation in case of LMV5 and LMV8.
Sudhir singh · 15-Jun-22 · 03:06 AM
Member · 14
Compounding will be considered according to KW.
Actually the unit in which the fixed charge is written in the tariff book is to be considered for compounding calculation.
So, HP will be considered for compounding calculation in case of LMV5 and LMV8.
Thank u very much sir...
Ratnakar009 · 15-Oct-22 · 12:10 AM
Member · 1
On which part compounding has to be taken
Sanction load of consumer or connected load at site found during checking
abhaysng · 03-Nov-22 · 10:11 AM
Member · 7
On which part compounding has to be taken
Sanction load of consumer or connected load at site found during checking
On Sanction Load
jitut20 · 05-Aug-24 · 08:08 AM
Member · 1
No FIR upto 5KW for wrong tariff . pls provide office order or ACT or supply code about it
MANOJ1990 · 22-Jul-20 · 08:07 AM
Member · 1